That quartz counter you're ripping out weighs three times more than you think. Here are the real weight and price numbers to plan your renovation cleanout in Montreal.
Tell us what you're removing β cabinets, counter, tile β and we'll give you a precise price range before dispatching a truck.
Call now
Here's something we have to explain on almost every kitchen renovation call: the price of a debris removal job doesn't just depend on "how much space it takes up" β it mostly depends on how much it weighs. Two kitchens of identical size can generate very different removal costs depending on materials β a kitchen with a laminate counter and melamine cabinets will cost noticeably less to haul away than an identical-size kitchen with a two-inch-thick quartz counter and ceramic flooring.
Same logic applies to a bathroom residential renovation: a lightweight fiberglass shower has nothing in common, weight-wise, with a 1960s-era enamelled cast-iron tub still found in plenty of older Montreal buildings. In this article we break down the real weights, the prices that follow, and how to plan your kitchen or bathroom renovation cleanout without surprises.
We get these calls year-round, but especially in spring and summer, when renovation season is in full swing across Montreal, Laval and the South Shore. Whether you're doing weekend DIY or hired a contractor for a turnkey project, debris removal almost always ends up at the bottom of the planning list β usually after demolition has already started. This guide lets you plan it from day one, with real numbers instead of a blind guess.
| Material | Approximate weight | Category |
|---|---|---|
| Laminate counter (per linear foot) | 3-5 lb | Light |
| Quartz/granite counter (per linear foot) | 15-20 lb | Heavy |
| Standard kitchen cabinet (melamine) | 25-40 lb | Light-medium |
| Fiberglass tub | 40-60 lb | Light-medium |
| Enamelled cast-iron tub | 250-350 lb | Very heavy |
| Tile + thinset (per square foot) | 4-6 lb | Medium-heavy |
| Toilet | 60-90 lb | Medium |
Approximate weights for reference, based on standard construction and residential renovation materials. Useful for understanding why two similar-sized projects can generate very different prices.
Melamine or MDF cabinets, laminate counter, lightweight ceramic backsplash, vinyl or engineered wood flooring. High volume, moderate weight.
Quartz or granite counter (often 15-20 lb per square foot at standard thickness), solid wood cabinets, a central island with a thick plywood base, ceramic or porcelain tile flooring.
A quartz counter for an average kitchen (roughly 30-40 square feet of counter surface) can weigh several hundred pounds on its own β often more than every melamine cabinet in the rest of the kitchen combined. That's why two clients with similarly sized kitchens can get different price estimates: it's not arbitrary, it's directly tied to the real weight of the load.
Removed appliances β stove, fridge, dishwasher, hood β add significant weight, but also an opportunity: if they're still functional, we prioritize donation or reuse over straight recycling. A working fridge that just doesn't fit the new kitchen design often finds a new home instead of ending up in pieces.
Fiberglass (light) vs enamelled cast iron (very heavy, common in pre-1980 buildings). Cast iron alone can weigh over 300 lb.
Toilet ceramic is dense but compact. A wood vanity with a granite counter adds notable weight for its size.
Thinset removed along with the tile nearly doubles the real weight compared to tile alone β often underestimated.
A fully renovated bathroom in an older Montreal building β with a cast-iron tub, wall tile on three walls, and a concrete floor underneath β generates a disproportionately heavy load for its small footprint. That's the kind of project where mentioning the building's age and presumed materials over the phone helps us give you an accurate estimate rather than a rough guess.
| Project | Typical materials | Estimated price |
|---|---|---|
| Bathroom β light | Fiberglass shower, vanity, toilet, limited tile | $200 β $350 |
| Bathroom β heavy | Cast-iron tub, full wall and floor tile | $350 β $500 |
| Kitchen β light | Melamine cabinets, laminate counter, vinyl floor | $350 β $500 |
| Kitchen β heavy | Quartz/granite counter, island, tile floor, appliances | $550 β $750 |
| Kitchen + bathroom combined | Simultaneous renovation, combined volume and weight | $700 β $1,100+ |
Estimated prices for Montreal, Laval and the South Shore. Confirmed over the phone based on exact materials, real volume and site access (floor, elevator, laneway).
For a single bathroom, demolished and cleared in one day, direct pickup is almost always the better option: no bin to manage in an already tight driveway, no rental to plan for a job that runs 24 to 48 hours. Our crew loads everything β tub, tile, vanity β in a single visit.
For a full kitchen, the answer depends on job duration. If demolition and removal happen in one day before the new elements arrive, direct pickup remains enough. If the job stretches over one to two weeks β the classic case when demolition, plumbing, electrical and new cabinet installation happen in sequence with gaps between each step β a 10-yard bin on a private driveway simplifies managing the debris that builds up gradually (drywall scraps, packaging from new appliances, flooring offcuts).
We cover the bin-vs-direct-pickup decision more broadly, across all job types, in another article on the blog β useful if your kitchen or bathroom renovation is part of a larger project touching other rooms too.
One last thing to consider: if your kitchen renovation involves removing a wall to open up the layout β a very popular design choice in Montreal renovations over the past few years β check first whether that wall is load-bearing before planning your cleanout. A removed load-bearing wall potentially changes your project's status with the city and may require a permit, on top of adding structural debris (framing lumber, sometimes steel) to what was expected to be a simple finishing job.
Melamine cabinets, laminate counter, vinyl flooring, elevator access. Light load despite the volume β direct pickup recommended, price toward the lower end of the range. See Pont-Viau.
Quartz counter, central island, tile floor, high-end appliances removed. Heavy load β direct pickup with a truck suited to the weight, or a bin if the job runs several weeks. See RosemΓ¨re.
Cast-iron tub, full wall tile, pre-1970 building with no elevator. Very heavy load for a small room β crew used to narrow stairway access. See VillerayβSaint-Michel.
Combined renovation over three weeks, several trades. 14-yard bin on a private driveway to manage the gradual buildup from both job sites. See Candiac.
Laminate or stone counter? Fiberglass or cast-iron tub? Floor tile, wall tile, or both?
One day = direct pickup likely. Several weeks = consider a bin.
Elevator, stairs, narrow laneway β this affects loading time and sometimes the final price.
With these three answers, we can usually give you a reliable price range in a single call, without needing an on-site visit for most standard residential projects. For more complex projects β combined kitchen and bathroom, an older building with unknown materials, particularly tight access β a quick photo estimate sent by text or email can also speed things up and avoid price adjustments once the crew is on site.
Cabinets, counters (laminate, quartz, granite), appliances, sinks and faucets, tubs and showers, toilets, vanities, tile and thinset, flooring (vinyl, wood, ceramic), removed mirrors and light fixtures.
Suspected asbestos in old thinset, leftover cleaning chemicals, removed hot water tanks (must be drained before pickup) β we can point you toward the right process.
A renovated kitchen or bathroom often generates materials still in good shape that just no longer fit the new design β functional cabinets, recent appliances, a vanity in good condition. Rather than sending all of it straight to landfill, we prioritize donation and reuse whenever possible: building material recovery organizations across the metro area regularly accept this type of donation, giving a second life to items that would otherwise be thrown out simply for being out of style rather than actually worn out.
For materials that can't be reused β broken tile, damaged countertop, worn flooring β downstream sorting separates wood, metal (faucets, fixtures) and inert materials like tile and concrete to maximize recovery over automatic landfilling. It's the same approach we apply on larger construction and renovation job sites across Greater Montreal.
Metal faucets and fixtures deserve a special mention: even damaged or outdated, they usually carry enough recovery value to justify separate sorting rather than a straight trip with the rest of the debris. A small habit that, multiplied across every renovation we handle each year in Greater Montreal, makes a real difference in how much material ends up landfilled versus reused in some form.
The logic changes when it's a restaurant kitchen renovation rather than a residential one. Commercial equipment β professional exhaust hoods, stainless steel cooking surfaces, commercial refrigeration, service counters β weighs noticeably more and often requires more complex teardown than standard residential appliances. A restaurant owner renovating during a temporary closure usually has a tight reopening deadline, which makes fast direct pickup particularly relevant β no bin to manage in front of a storefront on a commercial street, just an efficient job to clear the space before reopening.
For a restaurant or business that also manages recurring waste collection once reopened β organics, cardboard, glass bins β we cover that in detail in our article Recurring Waste Collection for Restaurants and Businesses in Montreal, a useful follow-up once the renovation phase wraps up and regular operations begin.
Sometimes a bathroom or kitchen renovation starts from a completely different scenario: water damage that forces an emergency demolition rather than a planned project. A dishwasher that overflows for hours, a toilet break that floods the floor below, a water heater that fails β in those cases, the "renovation" timeline disappears entirely and becomes a matter of fast intervention to avoid mould and structural damage.
If your kitchen or bathroom renovation starts from a disaster rather than a design choice, we handle it with the same service as any post-disaster cleanout β water damage or fire β with 24-48h response: we clear damaged materials quickly so your insurer and contractor can move forward without delay. Sorting what's genuinely unsalvageable from what can be saved is part of our approach for this type of intervention.
A good share of kitchen and bathroom renovations in Montreal happen in condo buildings β a unit in Old Montreal, a downtown residential tower, or a newer condo development in areas like LeMoyne or Boisbriand. In that context, the condo board often imposes additional rules beyond the municipal permit:
We regularly coordinate our pickups around condo constraints β booking the service elevator, respecting allowed time windows β so your kitchen or bathroom debris removal doesn't become a point of friction with the board or your neighbours.
One practical detail that comes up often in condo buildings: the path from your unit to the waiting truck outside can involve several hallways, an elevator, and sometimes an underground parking garage with limited clearance. We plan that route with you ahead of time β particularly for cast-iron tubs or heavy appliances β so loading happens quickly, without extra trips that could disturb other residents during allowed work hours.
Beyond price, the other question we get a lot is timing β how long the removal itself takes once our crew arrives. It's a fair thing to plan around, especially if you're coordinating with a contractor whose next step (plumbing rough-in, new flooring) depends on the old materials being gone.
Usually 30-60 minutes for loading once materials are already demolished and staged, longer if we're doing the teardown ourselves.
Typically 1-2 hours for a standard kitchen load, more for a heavy stone-counter job or an island that needs to be broken down first.
Add 30-90 minutes depending on the number of flights of stairs or how far the unit is from the loading dock or service elevator.
If your renovation is on a tight schedule β a new floor being installed the next day, a plumber booked for the following morning β let us know when you call so we can prioritize your pickup window rather than leaving it to the end of the day's route.
Not every kitchen or bathroom job comes to us the same way. Some clients demolish the space themselves over a weekend and just need the resulting pile hauled away. Others hire us to do both β tear-out and removal β as one visit. The price difference matters enough that it's worth clarifying upfront when you call.
If cabinets, tile and fixtures are already pulled and staged near an exit or in a driveway, our quote reflects pure loading and hauling time β generally the lower end of the price ranges above.
If you want us to remove cabinets, break tile, or disconnect fixtures ourselves, that adds labour time on top of hauling β we quote this separately once we know the scope, since a stubborn tiled shower stall takes a lot longer to break down than a bolted-in vanity.
A middle-ground option a lot of our clients choose: they handle the "easy" removals themselves (unscrewing a vanity, popping out a toilet) and leave anything requiring demolition tools β tile, a built-in tub surround, a load-bearing consideration β to us. It's worth mentioning this split when you call, since it changes both the price and how much time to budget for the visit.
A few items come up often enough on kitchen and bathroom jobs that they're worth flagging before you call, since they can shift your estimate outside the ranges above if they're not mentioned ahead of time.
None of these are deal-breakers β we deal with all of them regularly β but mentioning them on the initial call means the quote you get matches what we find on site, instead of needing an adjustment once the truck is already there.
Generally between $450 and $650 for a full kitchen, depending on real volume and the type of materials β a quartz or granite counter weighs far more than a laminate one.
A standard bathroom generally generates between $250 and $400 worth of debris to remove, including tile, the tub or shower, the toilet and the vanity.
Tile, stone counters, a cast-iron tub, and concrete under flooring are the heaviest elements. Wood, laminate and drywall weigh far less for an equivalent volume.
Not necessarily β for a bathroom demolished in a single day, direct pickup is usually simpler and cheaper than a bin.
Functional appliances are prioritized for donation or reuse when possible, rather than sent straight to recycling or landfill.
If you take one thing away from this article: the cost of clearing out your kitchen or bathroom depends first on the real weight of the materials, not just the size of the room. A small bathroom with a cast-iron tub and full tile can cost more to clear than a large kitchen with melamine cabinets and a laminate counter. Keep that in mind while planning your renovation budget, and don't hesitate to describe your materials precisely on the phone to get an estimate that actually reflects your project β not a generic average that ignores what's really coming out of your walls.
Planning a pickup? See all of our service areas, including Westmount. Related reading: The Weirdest Items We've Found Clearing Out Houses in Montreal and 5 Ways to Get Rid of Old Furniture in Montreal, Compared.
Call us for a clear estimate based on your real materials, not a generic average.
π (514) 295-2123From $150, same-day pickup often available in Montreal, Laval, the North Shore and the South Shore.
GoodBye Junk Montréal
Montreal, QC, Canada
Call nowFree quoteBook onlineAbout us